Skip to content
Our work

Projects delivered, energised and maintained

A selection of recent work across substations, solar, metering, lighting, automation and EV infrastructure.

80,000+
Smart meters installed
50+
Projects completed
10+
States served
99%
Client satisfaction
Project portfolio

Filter by category

Project details are indicative placeholders — replace them with your real portfolio in lib/site.js.

Showing 8 projects.

33/11 kV Substation — Industrial Area
Substations

33/11 kV Substation — Industrial Area

State Distribution Utility · Ghaziabad, Uttar Pradesh · 2024

Turnkey erection of a 33/11 kV substation including switchyard, protection panels, transformer erection and charging.

Capacity
2 × 5 MVA
Voltage
33/11 kV
Duration
7 months
1.2 MW Rooftop Solar Plant
Solar Solutions

1.2 MW Rooftop Solar Plant

Auto Components Manufacturer · Meerut, Uttar Pradesh · 2024

Design, supply and installation of a captive rooftop solar plant with net metering and a five-year O&M contract.

Capacity
1.2 MWp
Annual yield
1.7 GWh
Duration
4 months
Smart Metering Roll-out
Smart Metering Solutions

Smart Metering Roll-out

Distribution Company · West Uttar Pradesh · 2023

Survey, installation and HES integration of smart meters across residential and commercial consumers.

Meters
18,000+
Integration
HES / MDM
Duration
11 months
Municipal LED Street Lighting
Street Lighting

Municipal LED Street Lighting

Municipal Corporation · Modinagar, Uttar Pradesh · 2023

Retrofit of conventional street lighting to LED with feeder pillars and centralised control and monitoring.

Luminaires
6,400
Energy saved
58%
Duration
6 months
HT & LT Network — Warehousing Park
HT & LT Electrical Works

HT & LT Network — Warehousing Park

Logistics Developer · Hapur, Uttar Pradesh · 2023

Complete HT ring main, LT distribution and internal electrification across eight warehouse blocks.

Connected load
4.5 MW
Cabling
22 km
Duration
9 months
Highway EV Charging Hub
EV Charging Infrastructure

Highway EV Charging Hub

Mobility Operator · NH-58 Corridor · 2024

Power infrastructure and installation of DC fast and AC charging points, including transformer and panel works.

Chargers
12 points
Capacity
600 kW
Duration
5 months
Plant Automation Upgrade
Electrical Automation

Plant Automation Upgrade

Process Industry · Ghaziabad, Uttar Pradesh · 2022

PLC and SCADA upgrade with new MCC panels, VFD integration and operator HMI stations.

Panels
14 MCC
I/O points
900+
Duration
5 months
Institutional Campus Electrification
Industrial & Commercial Electrical Works

Institutional Campus Electrification

Educational Institution · Muzaffarnagar, Uttar Pradesh · 2022

Internal and external electrification of an academic campus with substation, DG backup and campus lighting.

Built-up area
3.2 lakh sq ft
Substation
1.6 MVA
Duration
10 months
Testimonials

What our clients say

They took over a substation package that was already behind schedule and still energised it on the revised date. The documentation at handover was the cleanest we have received.

Project Head

Transmission Projects, State Power Utility

Our rooftop plant has run for two summers without an unplanned outage. When a string tripped, their team was on site the same day.

Plant Manager

Manufacturing Operations, Auto Components Ltd

What stood out was the honesty during design. They talked us out of an oversized system and saved us a substantial amount of capital.

Director

Facilities & Infrastructure, Educational Trust

Get in touch

Have a similar project?

Share the scope and we will tell you how we would approach it, what it will take and what it should cost.